Adding an EV charger
Review the charger, daily charging needs, circuit route and existing home loads.
Planning an EV charger, heat pump or remodel? Start by understanding your existing electrical capacity and what your next project actually needs.
Serving the SF Bay Area. Share your address to confirm availability.

From our job sites
New 200A panels, meter mains and subpanels from recent HAXX jobs: neat wiring, torqued breakers and every circuit labeled.









Near you
A new appliance does not automatically mean a new panel. The assessment should explain the recommended path.
Review the charger, daily charging needs, circuit route and existing home loads.
Consider heating and cooling equipment alongside the rest of the electrical plan.
Look at future circuits, panel space, equipment condition and service capacity together.
Panel replacement, service upgrades and EV charging are related projects with different requirements. The final scope determines which steps apply.
Ask for a documented assessment of existing loads, planned equipment and the service size being proposed.
Confirm your city’s permit requirements. Where utility service changes are involved, clarify the utility coordination and schedule.
Define inspection responsibilities, outage planning, labeling and documentation before agreeing to the work.
Local reference: City of San Jose: EV charging project guidance ↗
Public information reviewed October 14, 2026.
A closer look at heating, cooling and electrical work by HAXX. Project locations are shown with each example.

On site during VAV box repair at Great Mall in Milpitas: access above a suspended ceiling, equipment and the work in progress.
Great Mall · Milpitas
Explore recent projects
Main panel installation.

Subpanel installation.

Heat pump installation.

Air conditioner installation.

Compressor replacement.
New equipment, property address and existing service information.
Equipment condition, load assessment and practical options.
Permits, utility work, circuit routing, repairs and inspection.
Confirm scheduling, outage expectations and project handover.
Oct 21, 2026A $1,200–$1,800 monthly bill, a burned EV charger and a hole in a 200-amp service wire. What HAXX found in a San Jose home, and why $50,000 of solar…
Read the story →
Oct 19, 2026An overhead panel upgrade can take from two months to several years on the PG&E side. Here is what drives the timeline and how to plan ahead.
Read the story →
Oct 23, 2026DeWalt isn’t just power tools anymore. A Los Altos client’s EV charger stopped working, so HAXX installed a new DeWalt Level 2 charger. Here’s what we…
Read the story →No single service size is right for every home. Existing loads, charging requirements and permitted load-management options need assessment.
No. Replacing distribution equipment and increasing utility service capacity can involve different work. Ask the quote to distinguish them.
Timing depends on assessment, permits, equipment and any utility work. Confirm the full project timeline separately from the time spent installing equipment.
Panel and service scope, circuit routing, access, utility work, permit requirements and surface repairs can affect cost. HAXX pricing must come from a property-specific quote.
A future heat pump changes the capacity conversation. Include it before electrical scope is finalized.
Explore ServiceFIND YOUR CITY
Pick your city to see every HAXX service available there, with local rebates, permits and rules.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
