Panel capacity check
A load check before the install tells you which charger size your service can carry.
Level 2 EV charger installation in Woodside for Tesla, Rivian, Lucid and every other EV, with the site plan and load calculation the Town asks for.
Serving Woodside Glens, Woodside Hills, Woodside Heights, Skywood Acres, Los Robles and the Skyline Boulevard area and the rest of Woodside. Share your address to confirm availability.

Hardwired wall chargers and 240-volt outlets for Tesla, Rivian, Ford, Hyundai and other EVs. Every install starts with a check of your panel capacity.
A load check before the install tells you which charger size your service can carry.
Tesla, ChargePoint, Emporia, Wallbox and other Level 2 chargers, plus NEMA 14-50 outlets.
Circuit routing planned for a clean install, including trenching for detached garages when needed.
Power-sharing between two chargers so both cars charge without a service upgrade.
Chargers that throttle when the house is busy, which can avoid a panel upgrade.
HAXX pulls the electrical permit and meets the inspector.
The Town of Woodside has its own EV charging station checklist. It asks for a site plan with trenching and setbacks, charger specs, panel sizes, load calculations and a three-line diagram.
HAXX prepares the site plan, device details and load calculation so the email submittal to the Town is complete.
Chargers at a detached garage or carriage house often need trenching or a new subpanel. HAXX shows the route on the site plan.
A HAXX electrician meets the Town inspector after the work is installed.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”
“I told him that the lights in my living room had been flickering for a while and asked if he could take a quick look. Instead of brushing it off, he immediately went to the main panel, asked a few questions, and then checked my subpanel in the garage.”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Ev charger installation.

Tesla wall connector installation.

Emporia ev charger circuit.

Span drive ev charger installation.

Nema 14-50 outlet installation.

Main panel installation.

Main panel upgrade.

Main panel replacement.
Yes. The Town of Woodside requires a permit with a site plan and load calculations. HAXX prepares and submits it.
Yes. HAXX runs a feeder or subpanel to the garage, with trenching shown on the permit drawings.
Most homes install a 40 to 60 amp circuit, which adds roughly 25 to 45 miles of range per hour depending on the car. Panel capacity sets the limit.
Often not. A load calculation and a right-sized circuit or load-management charger can avoid it.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
