Panel capacity check
A load check before the install tells you which charger size your service can carry.
Level 2 EV charger installation in Emeryville garages, driveways and condo parking, with a load calculation, HOA coordination and a city permit.
Serving the Triangle, Park Avenue District, Watergate, Bay Street, North Hollis and the Doyle Street corridor and the rest of Emeryville. Share your address to confirm availability.

Hardwired wall chargers and 240-volt outlets for Tesla, Rivian, Ford, Hyundai and other EVs. Every install starts with a check of your panel capacity.
A load check before the install tells you which charger size your service can carry.
Tesla, ChargePoint, Emporia, Wallbox and other Level 2 chargers, plus NEMA 14-50 outlets.
Circuit routing planned for a clean install, including trenching for detached garages when needed.
Power-sharing between two chargers so both cars charge without a service upgrade.
Chargers that throttle when the house is busy, which can avoid a panel upgrade.
HAXX pulls the electrical permit and meets the inspector.
Emeryville has an expedited, streamlined permitting process for EV charging stations, based on a state checklist. A complete application is deemed complete and processed for permit issuance.
Chargers in shared garages often need a circuit from the unit's panel or a house meter, plus HOA approval. HAXX plans the route and documents it for the board.
HAXX checks panel capacity and sizes the circuit to code before ordering equipment.
Wall connectors in private garages or outdoor units on driveways, with load management when capacity is tight.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“The technician from Haxx immediately pointed out multiple violations of the National Electrical Code and explained that the wiring was overheating and could potentially become a fire hazard. They offered to redo the installation the correct way, pulled the proper permit, and installed the EV charger safely and professionally. The city inspection passed without any issues.”
“Recently, my dishwasher stopped working, and they discovered it was actually an outlet issue. Not only did they diagnose it quickly, but they also fixed the outlet—saving me from calling an electrician. Reliable, professional, and skilled at handling both appliances and electrical issues.”
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Ev charger installation.

Tesla wall connector installation.

Emporia ev charger circuit.

Span drive ev charger installation.

Nema 14-50 outlet installation.

Main panel installation.

Main panel upgrade.

Main panel replacement.
Yes. Emeryville uses a streamlined EV charging permit based on its AB 1236 checklist. HAXX prepares the application and schedules the inspection.
California law limits an HOA's ability to prohibit EV chargers but allows reasonable conditions. Ask your board for its process; HAXX can supply the plans it needs.
Most homes install a 40 to 60 amp circuit, which adds roughly 25 to 45 miles of range per hour depending on the car. Panel capacity sets the limit.
Often not. A load calculation and a right-sized circuit or load-management charger can avoid it.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
