ELECTRICAL PANEL UPGRADE · BERKELEY

Electrical Panel Upgrade
in Berkeley, CA.

Panel upgrades and replacements in Berkeley for heat pumps, EV chargers and induction. HAXX handles the load calculation, city permit and PG&E coordination.

Serving Elmwood, North Berkeley, Thousand Oaks, Claremont, Westbrae and the Berkeley Hills and the rest of Berkeley. Share your address to confirm availability.

Main electrical panel replaced by HAXX in Cupertino
4.8 rating · 515+ reviewsHVAC & electrical, one teamPermits handledCA Lic #1081990

Panel and service
upgrades.

Most panel projects start with a heat pump, EV charger, induction range or remodel. HAXX begins with your real electrical load and only upgrades what the numbers require.

01 / ELECTRICAL PANEL UPGRADE

Load calculation

A written load calculation of existing and planned appliances, so you know whether you need more capacity at all.

02 / ELECTRICAL PANEL UPGRADE

Panel replacement

Replacing outdated, full or recalled panels, including Zinsco and Federal Pacific.

03 / ELECTRICAL PANEL UPGRADE

Service upgrade to 200 A

Coordinating the utility, meter and service equipment when the home needs more power from the street.

04 / ELECTRICAL PANEL UPGRADE

Subpanels

Adding a subpanel for a garage, ADU or new circuits when the main panel is out of space.

05 / ELECTRICAL PANEL UPGRADE

Load management

Smart panels and circuit-sharing devices that can avoid a service upgrade in some homes.

06 / ELECTRICAL PANEL UPGRADE

Permits and utility coordination

HAXX handles the permit, the inspection and the PG&E work order.

BERKELEY DETAILS

Panel upgrades
in Berkeley homes.

Many Berkeley houses still run on small, aging services. An electrical service panel upgrade is a full-credit measure under the city's BESO time-of-sale rules, as is a smart panel.

01

Load calculation first

HAXX calculates the existing load before recommending an upgrade. Some homes can add a heat pump or charger without one.

02

BESO credit

Berkeley's BESO guide lists both an electrical service panel upgrade and a smart service panel as full six-credit measures, with a permit and final inspection required.

03

Old equipment

Fuse boxes, Federal Pacific and Zinsco panels, and split-bus panels still turn up in Berkeley homes and are worth replacing.

What customers say
about HAXX.

Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.

“Recently, my dishwasher stopped working, and they discovered it was actually an outlet issue. Not only did they diagnose it quickly, but they also fixed the outlet—saving me from calling an electrician. Reliable, professional, and skilled at handling both appliances and electrical issues.”

Michaela K.Google ·

“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”

Kimberlee W.Google ·

“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”

Chris B.Thumbtack ·

A CLEAR NEXT STEP

From your first question
to a considered plan.

01

Share your starting point

Existing equipment, home layout and what you want to improve.

02

Review the property

Sizing, airflow, equipment placement and electrical needs.

03

Compare the scope

Options, exclusions, permit requirements and any eligible incentives.

04

Plan installation

Confirm equipment, scheduling and handover details with HAXX.

HAXX ON SITE

Real work.
Real homes and businesses.

A closer look at recent electrical work by HAXX.

Technician repairing a VAV box
VAV box repair · Original HAXX photo
THE PEOPLE BEHIND THE WORK

Hands-on work.
A real look inside.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.

Explore recent projects
  • HAXX Main Panel Installation

    Main Panel Installation

    Main panel installation.

  • HAXX Main Panel Upgrade

    Main Panel Upgrade

    Main panel upgrade.

  • HAXX Main Panel Replacement

    Main Panel Replacement

    Main panel replacement.

  • HAXX SPAN Smart Panel Installation

    SPAN Smart Panel Installation

    Span smart panel installation.

  • HAXX Subpanel Installation

    Subpanel Installation

    Subpanel installation.

  • HAXX Subpanel and New Circuits

    Subpanel and New Circuits

    Subpanel and new circuits.

  • HAXX Zinsco Subpanel Replacement

    Zinsco Subpanel Replacement

    Zinsco subpanel replacement.

  • HAXX Basement Subpanel and Circuits

    Basement Subpanel and Circuits

    Basement subpanel and circuits.

GOOD TO KNOW

Electrical Panel Upgrade in Berkeley: questions, answered.

Do I need a permit for a panel upgrade in Berkeley?

Yes. HAXX applies through Permits Online, coordinates the PG&E disconnect and reconnect, and meets the inspector.

Does a panel upgrade count toward BESO?

Yes. The city's BESO guide lists an electrical service panel upgrade as a full-credit measure when permitted and finaled. Note 'for BESO compliance' in the permit scope.

Do I need 200 amps?

Not always. A load calculation shows whether your current service can carry the new appliances, sometimes with load management. HAXX recommends an upgrade only when the numbers require it.

How long does a panel upgrade take?

The panel swap itself is usually one day. Permits and utility scheduling for service upgrades can add several weeks, so plan early.

LET’S TALK ABOUT YOUR PROPERTY

Tell us what you need.
We’ll start there.

Share the property, equipment and questions you have in mind.

(408) 901-8315
Call HAXX to discuss your property and scheduling.

HAXX fox mascot beside an air conditioning unit

    Required unless marked optional.

    A sentence or two about the issue or project.

    By sending this request, you ask HAXX to contact you about this service.

    Call HAXXBook online