Panel capacity check
A load check before the install tells you which charger size your service can carry.
Level 2 EV charger installation in Brentwood for any EV, with a CEC load calculation and the city's expedited EV charging permit.
Serving Trilogy at the Vineyards, Summerset, Shadow Lakes, Deer Valley, Carmel Estates and Downtown Brentwood and the rest of Brentwood. Share your address to confirm availability.

Hardwired wall chargers and 240-volt outlets for Tesla, Rivian, Ford, Hyundai and other EVs. Every install starts with a check of your panel capacity.
A load check before the install tells you which charger size your service can carry.
Tesla, ChargePoint, Emporia, Wallbox and other Level 2 chargers, plus NEMA 14-50 outlets.
Circuit routing planned for a clean install, including trenching for detached garages when needed.
Power-sharing between two chargers so both cars charge without a service upgrade.
Chargers that throttle when the house is busy, which can avoid a panel upgrade.
HAXX pulls the electrical permit and meets the inspector.
Brentwood offers an expedited EV charging station permit under Municipal Code Chapter 15.14. The city targets one to three business days for eligible projects, compared with up to ten for standard review.
An electrical plan, single-line diagram, charger specs and a CEC load calculation stating whether a panel upgrade is needed, signed by a C-10 contractor or electrical engineer.
Chargers count as a continuous load, so the circuit is sized at 125%. Larger units need a disconnect within sight of the charger.
Wall-mounted units in the garage, or a pedestal with the trench detail the city asks for when wiring is buried.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“Recently, my dishwasher stopped working, and they discovered it was actually an outlet issue. Not only did they diagnose it quickly, but they also fixed the outlet—saving me from calling an electrician. Reliable, professional, and skilled at handling both appliances and electrical issues.”
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Ev charger installation.

Tesla wall connector installation.

Emporia ev charger circuit.

Span drive ev charger installation.

Nema 14-50 outlet installation.

Main panel installation.

Main panel upgrade.

Main panel replacement.
Eligible projects use the city's expedited process, which targets one to three business days. Projects that don't qualify go through standard review.
Often. The load calculation the city requires shows whether the panel has room, and load management can close the gap.
Most homes install a 40 to 60 amp circuit, which adds roughly 25 to 45 miles of range per hour depending on the car. Panel capacity sets the limit.
Often not. A load calculation and a right-sized circuit or load-management charger can avoid it.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
