Panel capacity check
A load check before the install tells you which charger size your service can carry.
Level 2 EV charger installation in Millbrae for Tesla, Rivian, Ford, Hyundai and other EVs, with a load calculation, permit and inspection.
Serving Mills Estates, Millbrae Highlands, Millbrae Meadows, Meadow Glen, Green Hills and Telescope Hills and the rest of Millbrae. Share your address to confirm availability.

Hardwired wall chargers and 240-volt outlets for Tesla, Rivian, Ford, Hyundai and other EVs. Every install starts with a check of your panel capacity.
A load check before the install tells you which charger size your service can carry.
Tesla, ChargePoint, Emporia, Wallbox and other Level 2 chargers, plus NEMA 14-50 outlets.
Circuit routing planned for a clean install, including trenching for detached garages when needed.
Power-sharing between two chargers so both cars charge without a service upgrade.
Chargers that throttle when the house is busy, which can avoid a panel upgrade.
HAXX pulls the electrical permit and meets the inspector.
Millbrae building permits are submitted through the city's eProcess360 online portal. An EV charger needs an electrical permit, and the panel capacity has to support it.
HAXX sizes the circuit for continuous load and checks panel capacity before mounting the charger.
Wall units in attached garages, or outdoor pedestals where the car parks on a sloped driveway, common in the hills.
Two EVs or a tight panel? Power-sharing chargers and load managers keep the service from overloading.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“The technician from Haxx immediately pointed out multiple violations of the National Electrical Code and explained that the wiring was overheating and could potentially become a fire hazard. They offered to redo the installation the correct way, pulled the proper permit, and installed the EV charger safely and professionally. The city inspection passed without any issues.”
“Recently, my dishwasher stopped working, and they discovered it was actually an outlet issue. Not only did they diagnose it quickly, but they also fixed the outlet—saving me from calling an electrician. Reliable, professional, and skilled at handling both appliances and electrical issues.”
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Ev charger installation.

Tesla wall connector installation.

Emporia ev charger circuit.

Span drive ev charger installation.

Nema 14-50 outlet installation.

Main panel installation.

Main panel upgrade.

Main panel replacement.
Yes. HAXX submits the electrical permit through Millbrae's online portal and is on site for the inspection.
Often, yes. A load calculation and, if needed, a load-managed charger can avoid a full service upgrade.
Most homes install a 40 to 60 amp circuit, which adds roughly 25 to 45 miles of range per hour depending on the car. Panel capacity sets the limit.
Often not. A load calculation and a right-sized circuit or load-management charger can avoid it.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
