Standby generators
Permanently installed generators that start automatically when the power goes out.
Backup power for Los Altos Hills homes facing PG&E safety shutoffs: standby generators, transfer switches and inlets, sited to Town rules.
Serving Fremont Hills, Westwind Barn, Moody Road, Saddle Mountain, Altamont Road and Page Mill Road and the rest of Los Altos Hills. Share your address to confirm availability.

Standby generators and portable generator hookups installed with the right transfer equipment, so the house is powered safely and the utility line is never back-fed.
Permanently installed generators that start automatically when the power goes out.
An outdoor inlet and interlock or transfer switch, so a portable generator can power selected circuits without extension cords.
Manual or automatic transfer equipment sized to the generator and the loads you want to keep on.
Fridge, furnace blower, internet, lights and medical equipment moved to a backed-up subpanel.
Generator size matched to what you actually need to run, not guesswork.
Electrical permit, city inspection and utility requirements handled by HAXX.
PG&E has included Los Altos Hills in Public Safety Power Shutoffs, and well pumps stop when the power does. The Town has detailed rules for where a generator can go.
The Town's generator checklist sets side, rear and front setbacks and a noise limit, and Planning must approve the location. HAXX plans around them.
Automatic transfer switches must carry the full service or pre-selected loads, with load shedding. HAXX designs the switch and standby panel.
Some generators need Bay Area Air District approval before the Town issues a building permit. HAXX checks this early.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”
“I told him that the lights in my living room had been flickering for a while and asked if he could take a quick look. Instead of brushing it off, he immediately went to the main panel, asked a few questions, and then checked my subpanel in the garage.”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX. Projects in Los Altos Hills are marked with the city.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Sauna circuit installation.

Franklin gateway and span drive commissioning.

Server room subpanels.

Main panel installation.

Main panel upgrade.

Main panel replacement.

Span smart panel installation.

Subpanel installation.
Yes, if the generator and transfer switch are sized for it. HAXX includes the pump in the load calculation.
Yes. The Town requires Planning approval of the generator and fuel tank location, then a building permit and final inspection.
No. Back-feeding through an outlet is dangerous for you and for utility workers. Use an inlet with an interlock or a transfer switch.
It depends on the circuits you want to keep powered. HAXX lists your critical loads and sizes the generator to them.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
