Panel capacity check
A load check before the install tells you which charger size your service can carry.
Level 2 EV charger installation in Los Altos Hills for any EV: load calculation, Town permit, trenching to detached garages when needed.
Serving Fremont Hills, Westwind Barn, Moody Road, Saddle Mountain, Altamont Road and Page Mill Road and the rest of Los Altos Hills. Share your address to confirm availability.

Hardwired wall chargers and 240-volt outlets for Tesla, Rivian, Ford, Hyundai and other EVs. Every install starts with a check of your panel capacity.
A load check before the install tells you which charger size your service can carry.
Tesla, ChargePoint, Emporia, Wallbox and other Level 2 chargers, plus NEMA 14-50 outlets.
Circuit routing planned for a clean install, including trenching for detached garages when needed.
Power-sharing between two chargers so both cars charge without a service upgrade.
Chargers that throttle when the house is busy, which can avoid a panel upgrade.
HAXX pulls the electrical permit and meets the inspector.
The Town's EV charger checklist asks for a site plan, a single-line diagram, equipment specs and a CEC 220 load calculation. Qualifying projects get expedited administrative review.
HAXX prepares the site plan, electrical plan and load calculation, and sizes the circuit for continuous load.
Chargers in detached garages or at the end of long driveways may need trenching. The Town asks for a trenching detail when it does.
The Building Division inspects the finished install. A HAXX electrician is there for it.
Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.
“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”
“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”
“I told him that the lights in my living room had been flickering for a while and asked if he could take a quick look. Instead of brushing it off, he immediately went to the main panel, asked a few questions, and then checked my subpanel in the garage.”
Existing equipment, home layout and what you want to improve.
Sizing, airflow, equipment placement and electrical needs.
Options, exclusions, permit requirements and any eligible incentives.
Confirm equipment, scheduling and handover details with HAXX.
A closer look at recent electrical work by HAXX. Projects in Los Altos Hills are marked with the city.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.
Explore recent projects
Ev charger installation.

Tesla wall connector installation.

Emporia ev charger circuit.

Span drive ev charger installation.

Nema 14-50 outlet installation.

Sauna circuit installation.

Main panel installation.

Main panel upgrade.
Yes. HAXX submits the Town's application with the required plans and load calculation and schedules the inspection.
Yes. HAXX runs a feeder or branch circuit to it, trenching where needed, and shows the route on the permit plans.
Most homes install a 40 to 60 amp circuit, which adds roughly 25 to 45 miles of range per hour depending on the car. Panel capacity sets the limit.
Often not. A load calculation and a right-sized circuit or load-management charger can avoid it.
Share the property, equipment and questions you have in mind.
(408) 901-8315
Call HAXX to discuss your property and scheduling.
