ELECTRICAL PANEL UPGRADE · CUPERTINO

Electrical Panel Upgrade
in Cupertino, CA.

Upgrading an electrical panel in Cupertino? HAXX runs the load calculation, coordinates with PG&E and files the city permit, often as an instant permit.

Serving Monta Vista, Rancho Rinconada, Fairgrove, Garden Gate, Lynbrook and Inspiration Heights and the rest of Cupertino. Share your address to confirm availability.

Main panel upgrade by HAXX in Cupertino
4.8 rating · 515+ reviewsHVAC & electrical, one teamPermits handledCA Lic #1081990

Panel and service
upgrades.

Most panel projects start with a heat pump, EV charger, induction range or remodel. HAXX begins with your real electrical load and only upgrades what the numbers require.

01 / ELECTRICAL PANEL UPGRADE

Load calculation

A written load calculation of existing and planned appliances, so you know whether you need more capacity at all.

02 / ELECTRICAL PANEL UPGRADE

Panel replacement

Replacing outdated, full or recalled panels, including Zinsco and Federal Pacific.

03 / ELECTRICAL PANEL UPGRADE

Service upgrade to 200 A

Coordinating the utility, meter and service equipment when the home needs more power from the street.

04 / ELECTRICAL PANEL UPGRADE

Subpanels

Adding a subpanel for a garage, ADU or new circuits when the main panel is out of space.

05 / ELECTRICAL PANEL UPGRADE

Load management

Smart panels and circuit-sharing devices that can avoid a service upgrade in some homes.

06 / ELECTRICAL PANEL UPGRADE

Permits and utility coordination

HAXX handles the permit, the inspection and the PG&E work order.

CUPERTINO DETAILS

Cupertino panel
upgrades.

Many 1950s and 1960s Cupertino homes still have original 100-amp panels. Adding a heat pump, EV charger or induction range often makes the panel the first project.

01

Instant permit path

Cupertino offers instant permits to licensed contractors for same-location panel upgrades up to 200 amps in homes without an HOA. HAXX applies through the city's Accela portal.

02

Load calculation first

HAXX calculates the planned load before recommending a size. Sometimes a smart panel or load management avoids a service upgrade.

03

PG&E coordination

When the service size changes, HAXX handles the PG&E request and the disconnect and reconnect.

What customers say
about HAXX.

Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.

“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”

Kimberlee W.Google ·

“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”

Chris B.Thumbtack ·

“I told him that the lights in my living room had been flickering for a while and asked if he could take a quick look. Instead of brushing it off, he immediately went to the main panel, asked a few questions, and then checked my subpanel in the garage.”

Viktoriya S.Google ·

A CLEAR NEXT STEP

From your first question
to a considered plan.

01

Share your starting point

Existing equipment, home layout and what you want to improve.

02

Review the property

Sizing, airflow, equipment placement and electrical needs.

03

Compare the scope

Options, exclusions, permit requirements and any eligible incentives.

04

Plan installation

Confirm equipment, scheduling and handover details with HAXX.

HAXX ON SITE

Real work.
Real homes and businesses.

A closer look at recent electrical work by HAXX. Projects in Cupertino are marked with the city.

Technician repairing a VAV box
VAV box repair · Original HAXX photo
THE PEOPLE BEHIND THE WORK

Hands-on work.
A real look inside.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.

Explore recent projects
  • HAXX Main Panel Installation in Cupertino
    Cupertino

    Main Panel Installation

    Main panel installation.

  • HAXX Main Panel Upgrade in Cupertino
    Cupertino

    Main Panel Upgrade

    Main panel upgrade.

  • HAXX Main Panel Replacement

    Main Panel Replacement

    Main panel replacement.

  • HAXX SPAN Smart Panel Installation

    SPAN Smart Panel Installation

    Span smart panel installation.

  • HAXX Subpanel Installation

    Subpanel Installation

    Subpanel installation.

  • HAXX Subpanel and New Circuits

    Subpanel and New Circuits

    Subpanel and new circuits.

  • HAXX Zinsco Subpanel Replacement

    Zinsco Subpanel Replacement

    Zinsco subpanel replacement.

  • HAXX Basement Subpanel and Circuits

    Basement Subpanel and Circuits

    Basement subpanel and circuits.

GOOD TO KNOW

Electrical Panel Upgrade in Cupertino: questions, answered.

How long does a Cupertino panel permit take?

Same-location upgrades up to 200 amps without an HOA can qualify for the city's instant permit. Larger or relocated panels need standard review.

Do I need a 200-amp panel for a heat pump?

Not always. A load calculation shows whether the existing service has room. HAXX runs it first.

Do I need 200 amps?

Not always. A load calculation shows whether your current service can carry the new appliances, sometimes with load management. HAXX recommends an upgrade only when the numbers require it.

How long does a panel upgrade take?

The panel swap itself is usually one day. Permits and utility scheduling for service upgrades can add several weeks, so plan early.

LET’S TALK ABOUT YOUR PROPERTY

Tell us what you need.
We’ll start there.

Share the property, equipment and questions you have in mind.

(408) 901-8315
Call HAXX to discuss your property and scheduling.

HAXX fox mascot beside an air conditioning unit

    Required unless marked optional.

    A sentence or two about the issue or project.

    By sending this request, you ask HAXX to contact you about this service.

    Call HAXXBook online