ELECTRICAL PANEL UPGRADE · SAN JOSE

Electrical Panel Upgrade
in San Jose, CA.

Adding a heat pump, EV charger or induction range in San Jose? HAXX starts with a load calculation and upgrades the panel or service only when needed.

Serving Willow Glen, Cambrian, Almaden Valley, Evergreen, Berryessa and West San Jose and the rest of San Jose. Share your address to confirm availability.

Main electrical panel replaced by HAXX in Cupertino
4.8 rating · 515+ reviewsHVAC & electrical, one teamPermits handledCA Lic #1081990

Panel and service
upgrades.

Most panel projects start with a heat pump, EV charger, induction range or remodel. HAXX begins with your real electrical load and only upgrades what the numbers require.

01 / ELECTRICAL PANEL UPGRADE

Load calculation

A written load calculation of existing and planned appliances, so you know whether you need more capacity at all.

02 / ELECTRICAL PANEL UPGRADE

Panel replacement

Replacing outdated, full or recalled panels, including Zinsco and Federal Pacific.

03 / ELECTRICAL PANEL UPGRADE

Service upgrade to 200 A

Coordinating the utility, meter and service equipment when the home needs more power from the street.

04 / ELECTRICAL PANEL UPGRADE

Subpanels

Adding a subpanel for a garage, ADU or new circuits when the main panel is out of space.

05 / ELECTRICAL PANEL UPGRADE

Load management

Smart panels and circuit-sharing devices that can avoid a service upgrade in some homes.

06 / ELECTRICAL PANEL UPGRADE

Permits and utility coordination

HAXX handles the permit, the inspection and the PG&E work order.

SAN JOSE DETAILS

Panel upgrades
in San Jose.

Many San Jose homes from the 1950s to 1970s still have 100-amp service and full panels. Electrification projects are the most common reason homeowners call.

01

100-amp homes

A load calculation shows whether your current service can carry new equipment, sometimes with load management, before you pay for a service upgrade.

02

Permits through SJPermits

HAXX files the City of San Jose electrical permit, schedules the inspection and coordinates the PG&E work order for service changes.

03

Outdated panels

Older panels and full panels in garages and side yards are common in San Jose ranch homes. Location and clearances are part of the plan.

What customers say
about HAXX.

Rated 4.8 across 515+ reviews on Housecall Pro, Google and Facebook. Read more reviews.

“Recently, my dishwasher stopped working, and they discovered it was actually an outlet issue. Not only did they diagnose it quickly, but they also fixed the outlet—saving me from calling an electrician. Reliable, professional, and skilled at handling both appliances and electrical issues.”

Michaela K.Google ·

“I purchased a couple of ceiling fans and was reluctant due to how old my house was with old wiring so I wanted someone professional and trustworthy. They have been both!”

Kimberlee W.Google ·

“Prompt and professional - they helped run a new thermostat wire through a wall and crawl space.”

Chris B.Thumbtack ·

A CLEAR NEXT STEP

From your first question
to a considered plan.

01

Share your starting point

Existing equipment, home layout and what you want to improve.

02

Review the property

Sizing, airflow, equipment placement and electrical needs.

03

Compare the scope

Options, exclusions, permit requirements and any eligible incentives.

04

Plan installation

Confirm equipment, scheduling and handover details with HAXX.

HAXX ON SITE

Real work.
Real homes and businesses.

A closer look at recent electrical work by HAXX. Projects in San Jose are marked with the city.

Technician repairing a VAV box
VAV box repair · Original HAXX photo
THE PEOPLE BEHIND THE WORK

Hands-on work.
A real look inside.

On site during a commercial VAV box repair: access above a suspended ceiling, equipment and the work in progress.

Explore recent projects
  • HAXX Subpanel Installation in San Jose
    San Jose

    Subpanel Installation

    Subpanel installation.

  • HAXX Subpanel and New Circuits in San Jose
    San Jose

    Subpanel and New Circuits

    Subpanel and new circuits.

  • HAXX Zinsco Subpanel Replacement in San Jose
    San Jose

    Zinsco Subpanel Replacement

    Zinsco subpanel replacement.

  • HAXX Main Panel Installation

    Main Panel Installation

    Main panel installation.

  • HAXX Main Panel Upgrade

    Main Panel Upgrade

    Main panel upgrade.

  • HAXX Main Panel Replacement

    Main Panel Replacement

    Main panel replacement.

  • HAXX SPAN Smart Panel Installation

    SPAN Smart Panel Installation

    Span smart panel installation.

  • HAXX Basement Subpanel and Circuits

    Basement Subpanel and Circuits

    Basement subpanel and circuits.

GOOD TO KNOW

Electrical Panel Upgrade in San Jose: questions, answered.

Do I need a panel upgrade for a heat pump in San Jose?

Not always. Many variable-speed heat pumps fit on existing service once the load is checked. HAXX recommends an upgrade only when the numbers require it.

Who coordinates with PG&E in San Jose?

HAXX submits the service request and coordinates the disconnect and reconnect with PG&E.

Do I need 200 amps?

Not always. A load calculation shows whether your current service can carry the new appliances, sometimes with load management. HAXX recommends an upgrade only when the numbers require it.

How long does a panel upgrade take?

The panel swap itself is usually one day. Permits and utility scheduling for service upgrades can add several weeks, so plan early.

LET’S TALK ABOUT YOUR PROPERTY

Tell us what you need.
We’ll start there.

Share the property, equipment and questions you have in mind.

(408) 901-8315
Call HAXX to discuss your property and scheduling.

HAXX fox mascot beside an air conditioning unit

    Required unless marked optional.

    A sentence or two about the issue or project.

    By sending this request, you ask HAXX to contact you about this service.

    Call HAXXBook online